The variety of construction work undertaken by the company speaks volumes about its versatility.
Name of work & Location : |
Construction of 200 MLD capacity Raw Water Intake Well (With Approache Bridge) Under Jn NURM @ Mota Varachha at Surat, Gujarat. |
Client : |
Hydraulic Engineers Surat, Muni. Corporation |
Cost of Work : |
Rs.100.43 Millions |
Year of Completion : |
2014-2015 |
Features : |
1500mm dia pile with 40 mtr. PSC Girder and 16.5 mtr. dia well sink up to 35 mtr. in river TAPI. |
Name of work & Location : |
Construction of 360 MLD Intake well @ Sarthana, Surat, Gujarat. |
Client : |
Hydraulic Engineers- Surat Muni. Corporation |
Cost of Work : |
Rs.135.76 Millions |
Year of Completion : |
2011-2012 |
Features : |
1500mm dia pile with 40 mtr. PSC Girder and 16.5 mtr. dia well sink up to 35 mtr. in river TAPI |
Name of work & Location : |
Construction of Aqueduct Cross Regulator and Canal Earthwork on River Mazam at CH NO. 119. 480 km for sujalam-sufalam spreading canal, Gujarat. |
Client : |
Executive Engineer, Irrigation Div, Ahmedabad |
Cost of Work : |
Rs.89.65 Millions |
Year of Completion : |
2006-2007 |
Features : |
1500mm dia Pile Foundation total length of pile 1352 Rmt. |
Name of work & Location : |
Construction of Aqueduct Cross Regulator and Canal Earthwork on River Meshwo at CH NO. 130.920 km for sujalam-sufalam spreading canal, Gujarat. |
Client : |
Executive Engineer, Irrigation Div, Ahmedabad |
Cost of Work : |
Rs.101.11 Millions |
Year of Completion : |
2006-2007 |
Features : |
1500mm dia Pile Foundation total length of pile 1552 Rmt. |
Name of work & Location: |
Construction of road over bridge in Gothan Geon yard at Rly. Km. 276/22-24 (on Deposit Basis) on Vadodara – Mumbai BG line and on proposed DFCC line Km. 10/0 to 12/0 on Jahangirpura-Variya Navi pardi SH-168. |
Client : |
The Dy. Chief Engineer [C] II, Western Railway, Vadodara |
Cost of Work : |
Rs. 323.52 Millions |
Year of Completion : |
2017-18 |
Features : |
1200mm dia Piles with RCC Pier, PSC Girder and Steel Girder ( This ROB on proposed DFCC Line Km 10 to 12 on Jahangirpura-Varia-Navi Pardi (SH168) )
|
Name of work & Location : |
Construction of Fly over bridge at Dinesh chamber from Hatkeshwar to Hirawadi in Ahmedabad City+- |
Client : |
The Additional City Engineer, Ahmedabad Municipal Corporation, Ahmedabad |
Cost of Work : |
Rs. 374.77 Millions |
Year of Completion : |
2017-18 |
Features : |
1200mm, 1500mm dia Piles with RCC Pier, PSC Box Girder ( This FOB was proposed on Hatkeshwar Circle due to heavy traffic )
|
Name of work & Location: |
Construction of Fly over bridge and AMTS bus terminals at Hatkeshwar Junction, Ahmedabad City |
Client : |
The Additional City Engineer, Ahmedabad Municipal Corporation, Ahmedabad |
Cost of Work : |
Rs. 346.8 Millions |
Year of Completion : |
2017-18 |
Features : |
1000mm, 1500mm dia Piles with RCC Pier, PSC 3 Cell Box Girder ( This FOB was proposed on Hatkeshwar Circle due to heavy traffic )
|
Name of work & Location: |
Construction of Major bridge No. 111 (15 x 18.30 M) PSC Girders on pile foundation including substructure, protection work and other related works etc. between stations HALVAD and DHANALA in connection with Doubling of VIRAMGAM-SAMAKHIYALI BG section |
Client : |
Dy. Chief Engineer(C) III Western Railway Ahmedabad |
Cost of Work : |
Rs. 199.36 Millions |
Year of Completion : |
2016-17 |
Features : |
1200mm dia Piles with RCC Pier, PSC Girder, - Epoxy Painting on concrete surface, CPCC coating to reinforcement and - Launching of 30 nos. PSC Girders
|
Name of work & Location: |
Construction of ROB cum Flyover @ Level crossing Near Junction of NH 8B and NH 8E (Extn.) in the state of Gujarat. (Ajay-Tacon J/V) |
Client : |
The Executive Engineer, National Highway Division, Rajkot |
Cost of Work : |
Rs. 838.4 Millions |
Year of Completion : |
2016-17 |
Features : |
Multi Layer Bridge with Open foundation in hard rock, 1200mm dia pile foundation, RCC sub structure, PSC box girder, Retaining Wall, Erection, Fabrication and Launching of Steel Girder
|
Name of work & Location: |
Construction of ROB at Km. 5/9 - 6/9 between MSH-VG section and at Km. 5/4 - 5 between MSH-PTN section on New alignment for proposed Mehsana By pass on Ahmedabad Palanpur highway |
Client : |
Dy. Chief Engineer(C) II Western Railway Ahmedabad |
Cost of Work : |
Rs. 106.87 Millions |
Year of Completion : |
2015-16 |
Features : |
1200mm dia Piles with RCC Pier and Fabrication and Launching of Steel Girder on Running Railway Line
|
Name of work & Location : |
Development of Rail over bridge at level crossing having TVU>100000 in state of Gujarat through concession on BOT Annuity basis, Gujarat. (AEIPL - 26% and PIPL - 74 %) |
Client : |
National Highway Division |
Cost of Work : |
Rs.5034.00 Millions |
Year of Completion : |
2014-2015 |
Features : |
1200mm dia Pile with RE Wall and Comosite Steel Girder (Work was completed before 5 months with respect to schedule date of completion) |
Name of work & Location : |
Construction of 4-Lane ROB in Lieu of LC No. 306 @ Km. 487/30 on Ahmedabad-Mumbai BG Railway Line @ Ambica Tube Crossing Between Station Vavta and Maninagar @ Ahmedabad, Gujarat. |
Client : |
Ahmedabad Municipal Corporation, Ahmedabad |
Cost of Work : |
Rs.261.45 Millions |
Year of Completion : |
2011-2012 |
Features : |
1500mm to 600mm dia bored Piles total length of pile 10560 Rmt with PSC Girder running railway track. |
Name of work & Location : |
Construction of three lane flyover at jasodanagar cross road junction across NH-8 at Ahmedabad, Gujarat |
Client : |
Ahmedabad Municipal Corporation, Ahmedabad |
Cost of Work : |
Rs.186.77 Millions |
Year of Completion : |
2010-2011 |
Features : |
1200 mm pile foundation length of pile foundation 4514 Rmt. with RCC T-beam and PSC Box Girder |
Name of work & Location : |
Construction of approch bridge on both side of ROB in lieu of level crossing no.2 on Ahmedabad-Delhi B.G. Railway line at Gota at Ahmedabad, Gujarat. |
Client : |
Ahmedabad Municipal Corporation, Ahmedabad |
Cost of Work : |
Rs.235.46 Millions |
Year of Completion : |
2010-2011 |
Features : |
1200 mm pile lengthof pile 4783 Rmt. with RCC Box girder |
Name of work & Location: |
Construction of major Bridge A/C River Sabarmati on proposed New Route the institute area of Rayasan to GIFT Taluka & District Gandhinagar. |
Client : |
The Executive Engineer, Capital Project Division No. 3, Gandhinagar |
Cost of Work : |
Rs.91,35,77,729.00 |
Year of Completion : |
2016-17 |
Features : |
Stayed cable Signature Bridge, Pile Foundation RCC Sub Structure with PSC 3 Cell Box girder, Span 41.8 mt. x 16 nos, Length of bridge - 668.80 Rmt, FRL of bridge - 62.50 mt, Height of Pier (Above pile cap level to top of pier cap level) = 14 mtr, Av. river Bed level - 44.25 mt.
|
Name of work & Location : |
Construction of major bridge on sabaramti river on Dholka-Sahij-Vautha Palla road Ta. Matar, Dist- Kheda, Gujarat. |
Client : |
Executive Engineer Kheda (R&B) Division, Nadiad |
Cost of Work : |
Rs.382.76 Millions |
Year of Completion : |
2014-2015 |
Features : |
1500mm dia Pile Foundation length of pile 3636 Rmt. with 35 mtr. PSC Box Girder |
Name of work & Location : |
Construction of Bridge across sabarmati river on Gandhinagar Koba Arodram Road near Hasol Ahemedabad, Gujarat. |
Client : |
Capital Project Division No. 3 |
Cost of Work : |
Rs.364.64 Millions |
Year of Completion : |
2014-2015 |
Features : |
1500mm dia pile foundation total length of pile foundation 3239 Rmt. And 40 mtr. PSC girder. |
Name of work & Location : |
Widening of Manari Bridge at ship breaking yard Alang, Bhavanagar, Gujarat. |
Client : |
Executive Enigneer (Civil), New Port Bhavanagar |
Cost of Work : |
Rs.81.69 Millions |
Year of Completion : |
2014-2015 |
Features : |
1200mm dia Pile Foundation with RCC girder in tidle condition. |
Name of work & Location : |
Construction Bridge across river on Kim Kimamali Kosamba Road Ta. Mangorl, Gujarat. |
Client : |
Executive Engineer Panchayat (R&B) Division, Surat |
Cost of Work : |
Rs.104.75 Millions |
Year of Completion : |
2013-2014 |
Features : |
7.5 mtr. Well Foundation with 38 mtr. RCC girder. |
Name of work & Location : |
Construction of Major Bridge across Tapi River on Bardoli Timba Galteshwar Road, Gujarat. |
Client : |
R & B Division Surat. |
Cost of Work : |
Rs.301.42 Millions |
Year of Completion : |
2013-2014 |
Features : |
1500mm dia Pile Foundation length o pile 1603 Rmt and 40 mtr. PSC Box type Superstructure. |
Name of work & Location : |
Construction of Sub Structure of Variuos Major Bridges on Pile Foundation including Earth Work and Blanketing on Approaches and Misc.. Works like pitching tow wall etc. between khalipur and bhidi station in connection with patan-bhildi new BG line, Gujarat |
Client : |
Dy. C.E. (C) III, Western Railway, Ahmedabad |
Cost of Work : |
Rs.171.94 Millions |
Year of Completion : |
2013-2014 |
Features : |
Pile Foundation, RCC Sub Structure, Earth Pitching. |
Name of work & Location : |
Construction of bridge across Banas river [(Total length 876.53 mt. 23 spans (2x37.11) + (21x38.11)] on Jaipur-Tonk-Deoli Section of NH-12 (PKG-4) in the state of Rajsthan. |
Client : |
Morden Road Maker Pvt. Ltd. Mumbai |
Cost of Work : |
Rs.217.79 Millions |
Year of Completion : |
2012-2013 |
Features : |
1200mm dia pile foundation with 40 mtr. PSC girder. |
Name of work & Location : |
Construction of Bridge across river Vatrak from apruji Village joining Antarsuba-Khadal-Shipdi (MDR) Near Vaghavat Village Ta kapadvanj Dist Kheda. |
Client : |
The Executive Engineer Panchayat (R & B) Division, Nadiad |
Cost of Work : |
Rs. 60.26 Millions |
Year of Completion : |
2011-2012 |
Features : |
7.5 mtr. dia Well foundation with RCC Pier and PSC Girder |
Name of work & Location : |
Rebuilding of Double line steel Girder Br. No. 695 (11 x 18.28 m + 1 x 7.8 m + 1 x 6.18 m span) on CI screw piles by providing 7 x 30.5 m + 1 x 26.84 m span PSC box Girder on pile foundation & RCC sub structure on permanets Diverson at KM 468/30-469/12 between Mahamadabad & Nenpur Station on Vadodara- Ahmedabad Section, Gujarat. |
Client : |
Dy. Chief Engineer (C ) GP-1 Western Railway, Ahmedabad |
Cost of Work : |
Rs.186.67 Millions |
Year of Completion : |
2009-2010 |
Features : |
1200 mm pile foundation length of pile foundation 5714 Rmt. with 30.5 mt PSC Box Girder |
Name of work & Location : |
Construction of Bridge (Additional two lane) across Sabarmati River near village Bhat, Gujarat. |
Client : |
Patel Infrastructure Pvt. Ltd. |
Cost of Work : |
Rs.114.16 Millions |
Year of Completion : |
2007-2008 |
Features : |
1500 MM Dia Pile Foundation with 40 mtr. PSC Girder total length of pile 2828 Rmt. |
Name of work & Location : |
Constructio of Additional Two lane Bridge Across river Sabarmati near village Kamod for 60.0 M sardar patel Ring Road for AUDA, Gujarat. |
Client : |
Ex. Engineer , AUDA, Ahmedabad |
Cost of Work : |
Rs.95.59 Millions |
Year of Completion : |
2006-2007 |
Features : |
1500 MM Dia Pile Foundation with 40 mtr. PSC Girder total length of pile 3228 Rmt. (2 month early completed get 12 lacs bonous) |
Name of work & Location : |
Constof Bridge across River Sabarmati on Sardar patel Ring Road near Village Bhat, Gujarat. |
Client : |
Executive Engineer, AUDA, Ahmedabad |
Cost of Work : |
Rs.94.34 Millions |
Year of Completion : |
2005-2006 |
Features : |
1500 MM Dia Pile Foundation with 40 mtr. PSC Girder total length of pile 2828 Rmt. |
Name of work & Location : |
Const. of Major Bridge A/c River Saraswati & Rupen on Mehsana - Palanpur road for GSHP-6, Gujarat for HCC LTD, Mumbai with Sister Concern. |
Client : |
HCC Limited, Mumbai |
Cost of Work : |
Rs.123.02 Millions |
Year of Completion : |
2004-2005 |
Features : |
1200mm dia pile 6221 rmt. And 40 mtr. PSC Box girder. |
Name of work & Location : |
Construction of bridges in Group-1 (Rayam, Baleshwar, Mindhola) for Surat Manor Tollway Project Package-1, Gujarat. |
Client : |
DODSAL LTD Mumbai |
Cost of Work : |
Rs.54.90 Millions |
Year of Completion : |
2003-2004 |
Features : |
Well Foundation with PSC Girder. |
Name of work & Location : |
Construction of High level Bridge A/c River Mohana on Indore - Burhanpur - Ichhapur Section of State Highway No. 27, Gujarat. |
Client : |
Ashoka Buildcon Ltd Nasik |
Cost of Work : |
Rs.32.50 Millions |
Year of Completion : |
2003-2004 |
Features : |
1200 Dia Pile Foundation, Height of bridge 20 mtr. |
Name of work & Location : |
Construction of VUP is including approaches and service road on Ahmedabad-Mehsana road Km. 27 + 946 (Ambedkar Junction) |
Client : |
ILFS Limited |
Cost of Work : |
Rs.164.47 Millions |
Year of Completion : |
2015-2016 |
Features : |
Open Foundation, Four lane bridge with RE Wall. |
Name of work & Location : |
Construction of Sub way at Sini ni chal Junction on NH-8 for BRTS Ahmedabad, Gujarat. |
Client : |
Ahmedabad Municiapal Corporation |
Cost of Work : |
Rs.47.5 Millions |
Year of Completion : |
2010-2011 |
Features : |
1200 mm pile with RCC Box (Sub Way) |
Name of work & Location : |
Constructio of approach on Ring Road Near village Tragad for Sardar Patel Ring Road for AUDA, Gujarat. |
Client : |
Ex. Engineer , AUDA, Ahmedabad |
Cost of Work : |
Rs.87.31 Millions |
Year of Completion : |
2009-2010 |
Features : |
Under Pass |