The variety of construction work undertaken by the company speaks volumes about its versatility.
Name of work: |
Construction of Underpass on LC No. 162-B at Botad on Botad Salangpur Barwala Road. |
Location: |
Botad, Sarangpur, Gujarat |
Client : |
The Executive Engineer Bhavnagar R and B Division Bhavnagar |
Project Cost : |
Rs. 165.63 Millions |
Name of work: |
Development of N.H – 147 (Old NH – 8 C) including 6-lanning with service road on either side from km 31/300 to 35/480 (Package – III) in the state of Gujarat on EPC basis. |
Location : |
Sarkhej - Gandhinagar Highway, Ahmedabad, Gujarat |
Client : |
The Executive Engineer, National Highway Division, Ahmedabad |
Project Cost: |
Rs. 2660 Millions |
Name of work: |
Construction Of Flyover At Amroli Junction, Mansarovar Junction And Cross Road Junction In Surat City On EPC Basis (Design, Engineering, Procurement And Construction) |
Location: |
Amroli, Surat, Gujarat |
Client : |
The Executive Engineer (Bridge Cell), Surat Municipal Corporation, Surat |
Project Cost : |
Rs. 746.23 Millions |
Name of work: |
Construciton of Road Over Bridge (four lane) Nr. Village Dastan in Lieu of LC No.17/A at Rly. Km. 18/4-5 b/w STns Chalthan & Gangadhara for Surat-Bardoli Road (Old NH.6) |
Location: |
Dastan, Bardoli, Gujarat |
Client : |
The Managing Director, Gujarat State Road Devlopment Corporation, Gandhinagar |
Project Cost : |
Rs. 598.64 Millions |
Name of work: |
Construction of four lane road of Dabhoi-Tilakwada Road K.M. 31/0 to 50/0 Dist. Vadodara (AJAY-APEX JV) Ajay - 30% (Value of Contract 6382.76 x 30%) |
Location: |
Tilakwada, Vadodara, Gujarat |
Client : |
The Executive Engineer, Vadodara (Rand B) Division, Vadodara |
Project Cost : |
Rs. 191.48 Millions |
Name of work: |
Construction of Railway Over Bridge in Lieu of LC-105/B located at km. 2/5 – 6 on Surendranagar Gate – Joravarnagar Railway Station of Bhavnagar Division of W. Rly. Area of Surendranagar - Dudhrej Nagarpalika |
Location: |
Surendrangar, Gujarat |
Client : |
The Chief Officer, Dudharej Nagarpalika, Surendranagar |
Project Cost : |
Rs. 375.53 Millions |
Name of work: |
Construction of 2 Nos. Two Lane ROBs (including approaches & LHS) in lieu of Level crossings No. 81 & 153 at Km. 500/4-5 between Khimel - Falna Section & Km. 629/9-630/0 at Iqbalgarh Yard of Madar-Palanpur Section of Ajmer Division of North Western Railway. Ajay-Chetan (J/V) Ajay - 51% (Value of Contract 5007.49x51%) |
Location: |
Falna & Iqbalgadh, Rajsthan |
Client : |
Dy. Chief Project Manager/EN/I, DFCCIL, Ajmer |
Project Cost : |
Rs. 255.38 Millions |
Name of work: |
Construction of Six lane ROB with LHS including Electrification work in lieu of L.C. 211 Dantli, Goner Road on JP-DLI Railway Line, Jaipur |
Location: |
Dantali, Jaipur, Rajsthan |
Client : |
The Executive Engineer,Jaipur Devlopment Authority, Jaipur |
Project Cost : |
Rs. 616.58 Millions |
Name of work: |
Construction of ROB's on DFCC Route in Lieu of (1) L.C. No. 166 - I.R. Km 651/2-3 between Karjoda - Palanpur (2) L.C No. 188 - I.R. KM 681/2-3 between Dharewada to Siddhapur (3) L.C. No. 191- I.R. Ch-685/2-3 between Siddhapur-Kamli. |
Location: |
Siddhpur, Gujarat |
Client : |
The Executive Engineer, National Highway Division, Ahmedabad |
Project Cost : |
Rs. 637.81 Millions |
Name of work: |
Providing Limited height subways to eliminate various LCs between Udhna - Jalgaon section in connection with Doubling as well as road safety works between Udhna - Jalgaon section in Mumbai division of Western Railway. M/s. AJAY-MI (J/V) Ajay - 52% (Value of Contract 2485.20x52%) |
Location: |
Udhna - Jalgaon |
Client : |
Dy. Chief Engineer (C), Western Railway, Surat |
Project Cost : |
Rs. 129.23 Millions |
Name of work: |
Construction of Vehicular Underpass including Approaches & Service Roads at Sindbad Intersection at Km. 31+150 of Ahmedabad – Mehsana Road Project (SH-41). |
Location: |
Kalol, Gujarat |
Client : |
Gujrat Road and Infrastructure Company Limited, Ahmedabad |
Project Cost : |
Rs. 423.46 Millions |